50 Shades of Gray Apartment; Ready March 1st

Sneaky Peaky! For neighbor eyes only! And for ultra successful attractive secretive young fellows named Grey. lol!

This the 3rd floor offering at our Festival House on 2450 Parkwood Ave is available for rent starting March 1st, 2014. Below are photos. As you can see we are hitting the market in shades of Gray. Gray textured plaster, gray veins in Carrera marble, gray and white tile, black tile counter tops, stainless steel appliances, nickle anodized aluminum tile trims including a retro metal cove at the kitchen backsplash, dark gray doors, and gray toned luxury wood look vinyl plank flooring in the kitchen and bath. All that is missing is Grey’s heliport.

This is a two bedroom, one bath, plus living room and eat in kitchen. Monster walkin closet between adjoined bedroom. We wont tell what goes on behind the closet door if you wont. Snicker snicker. Excuse the clutter, we just refinished the wood floors. And they are Hot! Hot! Hot!

20150214_115931 20140907_100944 20140907_101033 20150214_115224 20150214_115256 20150214_115420 (1) 20150214_115435 20150214_115506 20150214_115525 20150214_115544 20150214_115602 20150214_115625 20150214_115713 20150214_115747 20150214_115831

Contact Mary for a showing.

Coming Soon; 3rd Floor Unit of Festival House

image

Here is Ben getting ready to grout the tile in the bathroom. Bathroom features a “shtub”, part shower part tub. As with a lot of these old homes the bathroom size challenged us. Too small for conventional tub. Window in the way for a built in shower. So we made our own custom fixture.

3rd floor Festival House will be available early May. Features brand new bath and kitchen. 1 bedroom. Big living room. Monster closet (all the monsters are nice). And something extra.

Contact Malcolm.

This Old Bath Before and After

As we say goodbye to This Old Bath and her cookie baking Owner, it is time to reflect on the difference we made, before and after. And to focus on details and people that made the difference.

Before and Afters 

Tub Area

20130705_171918

Before

20131119_142352

After

OK So we broke the soap dish on the install. Now fixed.

Old Shelf New Shelf. Pottery Barn!

20130705_172154

Before

20131119_143926

After

Old Curtain Rod. New Curtain Rod. Sans awful post. Wayfair.com.

20130705_171927

Before

20131119_142750

After

Old Mosaics we keep, but deep clean and seal with Terraglaze.

20130705_172126

Before

20131119_142323

After

Old tub a keeper too even with all its crackle. They just don’t make em like this anymore. :-(

20131119_144430

Towel bars and lumpy tilework. New bars and flat tilework.

20130705_171953

Before

20131119_144026

After

Details

Tasteful contrast carries thru even in the grout color.

20131119_144055

Ceramic GFI Cover Plate. Subwaytile.com. h/t Owner.

20131119_143949

People that made the difference and the details happen. Darrin, and the Owner (no pic)

wpid-20131024_123206.jpg

Tile by Daltile.
Plumbing fixtures by Strom Sign of the Crab.
Paint by Benjamin Moore/Color Concepts.

Other notes. We kept the cost down by doing tile over tile. Very little demo and reconstruction. Owner had leaky tile wall, but structurally sound for tile. We applied Kerdi waterproofing by Schluter over the tub and used all cement mortar in the same area. Mastic shown in pic above for areas not over tub.